Bob Bruner, dean of Darden, visited the Boeing factory and reflects on what makes operations successful:
The ingenuity one observes in a visit to a plant like Boeing’s is a reminder that process excellence is a vital driver of high performance. This is a message that we emphasize in our courses at Darden. It is not sufficient to deliver a quality product; it takes quality processes to generate a sustainable competitive advantage.
Source: Bob Bruner, Dean of the Darden school
Showing posts with label operations. Show all posts
Showing posts with label operations. Show all posts
Friday, August 17, 2007
Wednesday, June 13, 2007
Open Source & The Cathedral
Nicholas Carr distinguishes between the 'Cathedral' and 'Bazaar' model. The former is the traditional model 'from the ground up' for development of product and services and the later describes the 'Open Source' movement. The question is whether the Bazaar model can be used for everything like it was used for the development of Linux.
Carr claims that the bazaar model is most and only useful for actions that are divisible and require little coordination effort. Debugging is a typical tasks that can be parallelized. Like in an easter egg hunt, the bazaar model works best if there is a simple task 'find the easter eggs' and there are many independent participants.
The cathedral method is preferred for other tasks, e.g. product development from the ground up. It would be very challenging to develop a product in this way with so many participants. It should be noted, however, that even in the Linux project there was a tight advisory crowd that coordinated the debugging efforts of all the people. This ensured that the overall project moved into the right direction forward. As a side note, Wikipedia, another bazaar style project, does not have this kind of authority which makes it prone to prone to delays and errors.
In short, peer production works best for:
1. Routine tasks that can be pursued simultaneously by a big crowd
2. Projects in which labor is donated and can be parallelized.
3. Projects that are not totally egalitarian or democratic.
Source: Nicholas G. Carr, The Ignorance of Crowds, Business & Strategy, Summer 2007.
Thursday, August 10, 2006
Toyota Production Process (3 Steps)
Consider what the Toyota people are attempting to accomplish. They are saying before you (or you all) do work, make clear what you expect to happen (by specifying the design), each time you do work, see that what you expected has actually occurred (by testing with each use), and when there is a difference between what had actually happened and what was predicted, solve problems while the information is still fresh.
Source: http://hbswk.hbs.edu/item/3512.html
Source: http://hbswk.hbs.edu/item/3512.html
Subscribe to:
Posts (Atom)
